This is Why No Airport Privatization in the U.S.

I was President and CEO of Airports Council International – North America (ACI-NA) for eight years, from July 1, 2005 through June 30, 2013. During those eight years, I had more conversations than I could possibly count with people who wondered why airport privatization has not taken off in the United States. Many of these conversations were with people heavily involved in running or financing privatized airports around the world. Many were held with U.S. colleagues who thought privatization would provide benefits. In the world’s largest economy, and primary bastion of capitalism, airport privatization has remained the rarest of infrastructure animals. Why?

Climate Change Impact on Aviation: What You Need To Know

There are fundamental differences in how climate change impacts airports. Airports are operationally different from, say, power stations or seaports. For example power stations are intrinsically enclosed facilities; their encasement against external elements is relatively straightforward. With seaports, appropriate walls or physical barriers can be erected to shelter against potential increases in rough seas or in sea-levels.

For airports, it is not possible to simply build physical barriers to close them off against adverse atmospheric effects that may afflict flight operations.

Airport Workforce Development is Hotter Than Ever

Some time back, I wrote Airports Compete for New Talent about the challenges presented to today’s airport industry by the continuing need to attract, retain and develop airport talent.

Whereas most people think the biggest airport challenge is security or air service (important, of course), what really occupies the minds and conversations of airport executives is meeting this challenge. As Dan Parsons said in the first of his excellent three article series, “At some point, the job (of airport executive) becomes less about technical expertise and more about leading people.”

The question has become, where are those people coming from? Why are they different than what I am used to? And, how do I deal with all this? THOSE are the questions I most hear airport leaders discussing in the bars and restaurants – places where they can feel free to talk about any subject on their minds.

As I wrote back then, this was once an industry in which most talent came through certain pipelines and tended to stay through their careers. All of that has been upended. Many of those pipelines exist, certain schools still have good programs, and many people still obtain certain certifications. But the overall picture is uncertain and unsure.

Thailand Aviation: What Happened to It?

chuttersnap-348304-1024x684.jpg

In our growth markets series, we covered China, Turkey, Australia, Indonesia and South East Asia Aviation. Today, we take a look at Thailand.Last year, Thai Airways announced it was axing the Bangkok-Los Angeles route, in a move that put an end to 35 years of service to the US. Rome and LAX were two loss-making routes reported to be costing the airline $3 million a year. After a net loss of $445 million in 2014, Thai Airways’ debt skyrocketed to $5.9 billion, the highest among Southeast Asian airlines.

Once admired for its dream of competing with the likes of Singapore to become Southeast Asia’s global hub, Thailand has seen things changing fast. From the delivery of its flag carrier’s first A380 to the red stamp received by ICAO last year, Thailand seems to have lost its edge. Or has it? After all, Thailand’s airports have doubled traffic in six years, and carriers are ramping up with aggressive plans for expansion.

South East Asia Restructuring

Even excepting Malaysia Airlines, whose financial troubles were exacerbated by two major aircraft losses less than five months apart, Thai airlines are far from being the only ones to be in or near the red.

Cathay Pacific – whose shares reached a 7-year low this October - is the latest of these to acknowledge that massive restructuring will be needed if it wants to survive. In a post I wrote last year, I counted “less than five profitable LCCs (low cost carriers) in the region (for 24 actors), and barely ten FSCs (full service carriers) out of around 40 players”.

Even South East Asia’s flagship Singapore Airlines caught attention last year when it sent a scary message to investors:

SIA’s future is grim if it doesn’t change the way it do business. The days of Singapore and SIA being the long-haul hub for the ASEAN region is over.

- Mohshin Aziz, Associate Director of Equity Markets (Research) at Maybank Investment Bank

From this point of view, Thai Airways could be heading in the right direction. Its situation worsened in 2014, but now the airline appears to be in safe hands and its executives look confidently towards the future. After routes and staff cuts, the airline is now working on a 10-year expansion plan. All this is when its competitors are preparing bitter plans.

According to a Bangkok-based financial analyst quoted by Bloomberg, Thai’s “high costs, old fleet and inefficiency” kept the airline lagging behind budget and other FSCs in past years. But its management is convinced that "the worst is over".

Low Cost Takes All

Low cost carriers and Middle East carriers are usually blamed for the poor relative performance of legacy airlines in South East Asia. For sure, Bangkok is one of Middle East carriers’ top destinations. It is served by four daily flights each from Qatar Airways and Etihad, two from Turkish Airlines, and six flights a day from Emirates – as many as London Heathrow!

In 2014, Emirates carried 1.3 million passengers to Bangkok, making it the carrier’s second busiest destination. Thailand has also attracted long-haul LCCs Eurowings and Norwegian. That underlines how challenging it has been for Thai airlines to keep fares reasonably high and costs competitive, even with excellent offers. FSC Bangkok Airways, which once had plans to go for long haul cancelled its twin aisle jets orders long ago, and has since focused on profitable growth.

This is also the bet taken by Thai Airways when launching Thai Smile, a medium haul subsidiary launched to operate all single-aisle flights for its mother company. Thai Smile has lower operation costs - despite offering full service - and has allowed the group to keep expanding in Asia without hurting profitability.

Indeed, Asian medium haul traffic has been equally challenged by another kind of player: LCCs. Thailand has one of the highest low cost penetration rates in the world, comparable to Malaysia. On domestic routes, low cost penetration in Bangkok has grown from 40% in 2011 to 67% in 2016. Meanwhile, LCCs have a market share close to 30% for international routes out of Thailand.

As a result, in 2015 more than a third of passengers out of Bangkok are flying on an LCC. In Thailand, LCCs managed to stay relatively healthy, being either profitable (Thai AirAsia) or close to it and with positive margins (Nok Air). Nok Air would likely be profitable if the domestic market had not declined in 2014 following political instability.

Safety Concerns

In 2013, Thailand’s political unrest along with bombings in Bangkok made headlines. These had an impact on tourism, but despite that arrivals have consistently increased, more than doubling since 2009 with the exception of 2014 where tourist flows dropped severely. And although arrivals grew 11% on average in the past decade, still it is believed that some domestic and international routes have overcapacity.

About a year ago, following the fall of the previous government, ICAO downgraded Thailand’s aviation safety rating, after audits reported breaches and lapses. As a consequence, the US-based FAA as well as Japan and Korea are restricting Thai airlines from opening new routes. The FAA also prevents Thai airlines from expanding codeshares with US partner airlines.

Safety concerns could also have impeded the expansion of Thai airlines to internal destinations, but it is fair to say that the restrictions did little damage to Thai Airways: the airline has mostly cut routes these past years to reduce losses.

However, Thai Airways executives have confirmed that the airline will be looking for expansion soon. Getting the Thai civil aviation regulatory body back up to standards will be critical in making sure the airline can easily ramp up business on markets untouched during restructuring. The government is said to be working hard to restore the appropriate level of safety, allowing Thai airlines to expand on safer grounds.

Bangkok Airports Handle 80+ Million Passengers

Bangkok is an impressive aviation capital. With 83 million passengers flying in and out in 2015, the city is the 12th busiest aviation system in the world. Suvarnabhumi, the main gateway to Thailand, reached its full capacity of 45 million passengers five years ago.

Suvarnabhumi airport has been known to impede aviation growth in Thailand, and this year IATA CEO Tony Tyler called for the country to accelerate expansion and fix key issues. However, Airports Of Thailand (AOT) hopes to progressively double capacity to 90 million passengers by 2021 and has already taken "the first step in Suvarnabhumi Airport becoming an Asian hub," according to the Minister of Transport.

Construction work to expand the airport began this year. The first phase, to be completed in 2019, aims at increasing current capacity by 30%, to 60 million passengers. Two other expansion phases are planned that include the addition of a third runway and a second terminal.

When Suvarnabhumi airport first opened in 2006, it was to replace Don Mueang international airport, Thailand’s former international gateway. Don Mueang was closed in September 2006, after all operations moved to Suvarnabhumi.

Don Mueang Airport Reopened

But Don Mueang reopened shortly after following technical problems at Suvarnabhumi that reduced the airport’s capacity, and issues with high airport charges. By 2012, the Thai government ordered all LCCs to be moved out of Suvarnabhumi, in an attempt to reduce congestion.

It is important to recognize that 2012 was already a critical year for Suvarnabhumi Airport: it handled 53 million passengers - like in 2015 - despite its capacity of 45 million. Since then, Don Mueang has grown at the same rapid pace as LCCs carriers in Thailand. More than 30 million passengers passed through the airport in 2015, making it the world’s biggest LCC airport. Aided by the growth of carriers like Air Asia and Nok Air, Don Mueng airport reported a 21% year on year growth in September 2016.  In less than five years, Southeast Asian LCCs have grown so fast they have saturated a 30 million-passenger airport reopened solely for low cost traffic.

Airline-Operated Airports

Thailand’s biggest airports (Bangkok Suvarnabhumi, Don Mueang, Phuket, plus regionals Chiang Mai and Hat Yai) are operated by Thai public company Airports of Thailand (AOT). Most other Thai airports are operated by the Thai department of civil aviation. AOT’s six airports accommodate most of the country’s passengers and account for 110 million passengers (21% growth in 2015).

Thailand is also one of the few countries where private airlines operate airports. Bangkok Airways operates three airports at Koh Samui, Sukhothai, and Trat. Sukhothai and Trat are small airports, but Koh Samui handles 2 million passengers a year, making it the country’s seventh busiest airport; authorities have been weighing the construction of another airport there for a long time. Bangkok Airways built the airport several decades ago before Koh Samui became a busy tourist destination. Now, the authorities want to build a new publicly-owned airport to ensure that all airlines benefit from fair landing rights and competitive fees.

Airport Talent

Bright Future

As this article was being written, freshly-released September 2016 figures show double-digit growth in almost all areas. A tough market, sometimes affected by political unrest, has troubled a few airlines in Thailand, but agile LCCs have managed to keep Thais travelling.

Most carriers are now focusing on restructuring and profitable growth, both domestically and internationally. Infrastructure will likely remain a concern as it is difficult for capacity growth to catch up with flight growth. But Thailand looks to be doing better than many of its ASEAN counterparts on this point.

The conclusion is that with an improved infrastructure and airline profitability, Thailand will likely soon be back on its way to becoming a major aviation hub in the region.

Please leave your feedback or comment in the area below.

Photo: chuttersnap/Unsplash

Airport People Power: Diversity

People top view

This is part three of a series where I explore concepts associated with people management, inspired by Greg Principato's post on the key concern of airport executives: people. Part one is on discipline and part two on development.

So far, we’ve discussed people management techniques that apply to your current workforce. This article relates more to building or replenishing your team in a way that should see its output increase. It is also a relatively controversial concept.

The reasons why workforce diversity is still a “special interest” activity rather than part of our “day to day” varies. It is likely to be a combination of poorly implemented corporate policy, fearful entrenched management and, even cultural prejudice (be it racism, sexism, agism, etc.). It might also be because diversity interventions can conflict with a person’s morals and values.

To help us avoid some of these problems, we’re are going to look at two limited premises - the benefits of diversity and unconscious biases - and one technique leaders can use to embrace and promote diversity. And unless otherwise stated, this article considers diversity across multiple domains including gender, disability, ethnicity, etc.

Diversity is Better Business

There appears to be at least two different types of arguments that diversity is not only good business but better business. The first category puts forward that diverse teams perform better than non-diverse teams. The second category argues that with society becoming more diverse generally, businesses need to embrace diversity in order to maintain their workforce.

In the first case, research abounds with comparisons between businesses said to be more diverse and those considered less with results said to show that the first group outperforms the second. The diversity being examined includes numbers of women on the board, gender in the general workforce (.docx file), and ethnic diversity in the general workforce.

Since the numbers all vary, readers are encouraged to explore these and other links to satisfy themselves on whether performance and diversity correlate.

On the second point, demographics of western society typically show that the representation “traditional” white, male workforce is shrinking relative to other sections of society. In non-western societies, change is also occurring due to globalisation and an increasingly mobile society.

In order to attract and retain this “new” workforce, business has to embrace diversity (often referred to as diversity’s twin, inclusion). In a competitive job market, those companies and those teams that work to foster an inclusive environment, will get their pick of the talent. Why would you want to shut out a growing segment of the labour pool?


Hiring?

Jobs for Airport Professionals

AirportTalent.com


Barriers to Better Business

And yet people, leaders and team members, still put up barriers to diversity. The reasons may vary with fear, apathy and ignorant bliss as examples but this author believes that they are always rooted in some internal bias.

These biases may be deep-rooted prejudices or they may be rather superficial rules of thumb based on experience or the cultural context in which one has grown-up. Sometimes, they might be rather explicit and conscious or they can be quite unconscious. It could be argued that all biases have an unconscious root*.

It’s Not Your Fault

Unconscious biases are a product of our experiences. As we have travelled through life, we have learnt things, who to trust, what works well, where danger lurks, and we have constructed mental models of the world to guide us in future decisions. Interestingly, it is just as much about what we don’t experience that can bring our mental models undone when the world changes around us.

Take for example the Australian business leader that was “humiliated” in front of a large audience when a strong diversity trainer called him on stage with a Torres Strait Islander woman. In turn, he was shown that the woman on stage struggled in life due to personal characteristics he didn’t share and that he had never even thought about them, either positively or negatively.

This often manifests in an attitude that there isn’t a problem in need of fixing and even minorities are not immune. At a Women in Airports Breakfast held a couple of years ago, the panelists, three very successful airport leaders, were asked about pay disparity between men and women. In response, all three stated that they had never had a problem with their own remuneration and, in the aggregate, dismissed the questioner's concerns. Those familiar with this issue will be able to point to research that shows that "women, on average, earn less than men in virtually every single occupation for which there is sufficient earnings data for both men and women to calculate an earnings ratio".

The Challenge is to Challenge

So, if we accept that diversity is essential to future success and that we may be operating on unconscious biases, what can we do about it?

The answer is to challenge our decisions regarding our team. Obviously, this relates to selection decisions but it also includes the requirements we set for positions, the feedback we give our current team and the individuals we identify for development opportunities.

At first, it is worthwhile to just challenge your own decisions and choices. Ask yourself, why do I prefer Dave over Ramona? The answer might not even be that you have always had a man in that role. It could be that your childhood friend was named Dave or that your first ex-girlfriend was named Ramona**. Once you have identified any biases, you should be able to look past them.

In organisations actively promoting diversity, they may have implemented procedures designed to challenge potentially biased decisions. In some HR departments, they have been instructed to challenge essential requirements put forward by hiring managers. They are asking questions like why is a degree from particular colleges required and why do they require past experience with certain companies? And in other cases, job advertisements must pass an additional stage gate where an independent manager must review the content for potentially biased language.

In all these cases, the result of the challenge may be that nothing changes. Dave might be the best candidate for the position and that job might require a Stanford education with experience at a management consulting company. The point is that these decisions were challenged and, over time, a more inclusive bias will become the norm.

From Decisions to Concepts

The natural progression from challenging decisions is to begin to examine the concepts behind these decisions. For example, if we go back to Dave and Ramona and our essential requirements for their job, through the process of challenging these decisions, we might end up challenging the concept of “best candidate for the position”.

Let's say that Dave is better at the job. You can pick the measure by which this assessment is made, past performance, advanced qualifications, original research that has progressed humankind’s understanding of the field, but the assumption is that he is better. If selected, Dave will become a part of your team and a social dynamic now comes into play. How will Dave contribute to the team environment as compared to Ramona? Are we even considering this as part of the selection process?

In the graph below, we are assuming that Dave is “better” at doing the job and that Ramona is “better” in terms of contributing to the team. What constitutes “better” now depends on the role and the dynamics of the existing and even future team. This picture is not a rule for assessing men versus women, experience versus new ideas, or Anglo-Celtic versus Latin heritage, it’s just a hypothetical example.

Airport People Power: Diversity Graph

The graph offers three ways of comparing the two of them and coming to a decision of which to select for the role in your team. The left hand version could be described as the “best person for the job” approach and, interestingly, could be considered the most anti-discriminatory. It doesn’t consider gender, age or ethnicity at all. The middle graph considers the potential impact of diversity on the team and considers it in tandem with the traditional approach. Maybe Ramona becomes the “better” choice and maybe Dave is still your preferred candidate. On the right hand side, the technical aspects are reduced to the minimum requirements, a simple tick of the “can they do the job” box with the diversity score added to the base. Here Ramona is the clear choice because of what she may add to the team.

Which approach to take is always the choice of the hiring manager but at least now they might be challenging their approach within the context of what they want to achieve. If diversity is important to them they’ll tend to the middle or right. If performance is important to them, where might they go?

If there is one thing that is true for this field of business, is that discussion is necessary. If we are to do diversity “right”, we need to bring in a range of points of view. To that end, we welcome your comments and feedback below.


* Some very introspective or mindful people may have explored all their own feelings to establish their biases but I would consider these people relatively rare.

** After writing this, I became completely aware of how biased towards a male reader this article is. Perhaps this is because this is the audience that needs to read this, or that I perceive that female leaders are under represented in the airport sector generally or that I am a closet misogynist - I hope its not the latter.

Photo: Header by Timon Studler/Unsplash, graph by author

Airport People Power: Development

This is part two of a series where I explore concepts associated with people management, inspired by Greg Principato's post on the key concern of airport executives: people. The first article in the series looked at discipline.

There seem to be a million internet memes on developing your staff with the “what if we don’t and they stay” posting on LinkedIn on a seemingly four-week cycle. So, it seems almost needless to discuss why we need to invest in our teams but we will, briefly, and then will move into some ideas on development that won’t break the bank.

Faster, Better, Quicker

Continuous improvement is a hallmark of modern business and it doesn’t just relate to safety. Stock holders in publicly-listed airports expect growth & returns, customers expect increased service & amenity and executives want to deliver on these expectations. One of the biggest problems for airports, is that the infrastructure to deliver on some of these expectations takes time to build. In the meantime, we often expect our people to do more with what they have.

But this is only the start of the story. You can’t just dump these expectations on people without creating an environment that encourages and supports the growth in the people we need to support the growth in the business.

Retention

A second big argument for developing your people harks back that well-trodden meme I mentioned earlier. The third point in that discussion, for me, would be, “if we don’t invest, they (the good ones at least) will leave”. Part of what people think of as being talented, is having the drive to learn, grow, progress. If our people aren’t getting this from their job, they will look for it elsewhere.

Development as an incentive is a great retention strategy. This author has definitely stayed on with a company offering a development opportunity where alternate career paths were available. It must be remembered, however, that it’s not a guarantee. Some people will leave after having developed a new skill at your expense. The goal is to, with respect to your overall program, think in the aggregate rather than the specific.

Personal Satisfaction

Another great reason for taking a strong stance on development is that it can be greatly rewarding from a purely personal point of view. In spite of all the worry associated with people leaving after you have invested time and money in them, seeing a team member that you have supported and developed leave to take a new opportunity; one that they wouldn’t have dreamed was a possibility before, is exciting and extremely satisfying.


Looking for Talent?

Airport Jobs

Post your job on AirportTalent.com


The Three Es

In a lot of internet and company literature, development activities are often broken down into experience, exposure and education. They even have a rule regarding how much of each but we’ll get to that in a moment.

  • Experience can be described as learning by doing. At its most basic level, this is on-the-job training of new team members to bring them up to the minimum standard. Moving beyond this, experience involves assigning team members work beyond or outside their current duties.
  • Exposure is similar to experience in that it is often a workplace setting but it doesn’t involve any actual doing. It often includes work shadowing or even mentoring. It can also include attending a networking event or a conference.
  • Education is the more traditional view of development typically involving off-site training in either short or longer term, formal settings.

Now the rule often cited in relation to the three Es is 70:20:10 - as a breakdown of the ratio between the three activities. Some sources seem to cite this rule as descriptive rather than prescriptive but it's not a bad guide to use in development planning.

So which ratio relates to which activity? Experience should represent 70% of the development plan, exposure should make-up 20% and education is the other 10%. As the bulk of development should relate to experience, let’s look at a great approach to using it in the development of a team member.

Stretch

Work hardening is a metallurgical process by which a material is strengthened by incrementally straining and releasing a piece of it. Using stretch in development is a similar concept but more mental than physical, of course. A stretch project is a task or project that is thought to sit beyond the team member’s current job level.

Assigning a team member a stretch project works on a couple of levels:

  • Firstly, it challenges the team member and fights against stagnation and boredom.
  • It can (should) lead to a sense of achievement, pride and increased job satisfaction.
  • It also, perhaps selfishly, gets an important project done.

This may seem like exploitation and, if not initiated from a position of collaboration, it could be. It is, therefore very important that the development discussion involves whether the team member is looking for a stretch assignment, in what areas they want to develop and what is their current capacity to take the project on. A stretch project should always be a collaborative decision and for a manager, extra care should be taken to avoid implied expectations - i.e. if you don’t take this project, you won’t be considered for other development opportunities.

Supporting a Growth Mindset

It takes a supportive corporate culture for stretch to work. Much like the implied expectations mentioned above, a culture that doesn’t accept failure will not support stretch projects. No team member will accept a stretch project, if they see it as a poisoned chalice. A positive culture is one that cultivates a growth mindset.

A growth mindset puts learning at the forefront and, as such, comes at the world with a certain set of assumptions. The big ones associated with the discussion here are:

  • Challenge is a part of learning.
  • Effort leads to learning.
  • Criticism is for learning.

Does this mean failure is an option? It depends what you consider a failure. Mistakes are inevitable and are not be feared. Failure will only occur when the goals are not clear, the team member hasn’t fully accepted the project and the manager isn't supporting the project. This is not a set and forget activity.

Building Momentum and Keeping it Up

A support structure is essential to the success of a stretch project. If the company has a formal project management process then this is a good place to start but regular documented meetings looking at the project itself as well as the needs of the team member are a minimum. Since time is often our most precious commodity, it is also our most precious gift. Schedule time to support your team member and their success will be your success - see the personal satisfaction section above.

In the final article of this series, we will take an exciting look at workforce diversity in the airport field. As always, please feel free to contribute to the conversation below with a comment or feedback.

Airport People Power: Discipline

Airport People Power: Discipline

 

This is part one of a three part series on approaches to airport people power inspired by Greg Principato's post on a key concern of airport executives: people.

At some point in the careers of most airport managers, the job becomes less about technical expertise and more about leading people. There are plenty of books on leadership, business and management by more eloquent, intelligent and talented people than this author. But in recently building a new airport team and operating model in a challenging regional airport environment, three areas of focus came to the fore.

The first of these is operating discipline. This area is, by far, the most foundational. It takes significant work to set up but it has a long lasting effect.

Operating discipline isn't some militaristic objective with a view to everyone doing exactly the same thing, marching to the beat of a drum played by the manager. It should not be considered or implemented as a restrictive regime limiting the free will of frontline staff.

But we can't escape the fact that many aspects of airport operations, such as security, airside safety, customs, quarantine, etc. are highly regulated with prescribed standards. Furthermore, there can often be unforgiving consequences to errors either through regulatory sanctions or real-world impacts to people and property.

class="p1">So how do we create an environment that ensures what needs to happen happens and still lets people have some ability to exercise creativity and initiative?

Focus on Outcomes

Airport People Power: Discipline

It might seem too easy to simply say “set the destination, not the route”, but let’s consider this approach first.

The reason for anyone to do anything, in business, is to realise a desired outcome - to achieve an objective. That outcome could be to declare the runway serviceable, to confirm a passenger’s eligibility to enter your country or to have a clean floor.

By starting out from this position, you and your team members will share the “vision” of what the process is trying to achieve. This can be powerful; Especially if the subsequent process you design doesn’t result in the desired outcome or the variables outside of the original plan get in the way. Sharing the vision will help make the process more resilient and self-correcting, but more on that below.

The Verb in this Situation is Build

What you build is completely up to you but generally there would be documented descriptions of the work required - call them Standard Operating Procedures (SOPs), Safe Work Method Statements (SWMS), Standard Work Practices (SWPs), it doesn’t matter what the name is.

As you build, keep in mind the old saying often attributed to Einstein, “everything should be as simple as possible, but not simpler”. Be critical of everything that goes into any work process. There is danger in too much, it will be too difficult, ignored or circumvented, and there is danger in too little, parts of the work missed altogether or the ramification of certain results not understood.

Sometimes there is no room for creativity. A manufacturer’s requirements on a pre-start test of a walk-through metal detector is a pretty specific process. If the equipment has to checked at 15 points with a test piece in a specific orientation, then that’s what has to happen. There is no way around that.


Looking for Talent?

Airport Jobs

Post your job on AirportTalent.com


Developing Processes

While not advocating a specific approach to developing these work processes, it is strongly advised that whatever approach you take, it is consistent in itself. After all, that is our objective here.

If you do go down the SOP route, make up a standard template, use code references, date the procedure, use versioning, have standard pre-task activities, icons to highlight hazards and a standard approach to numbering steps. Set a culture of meeting expectations but set them with your team.

Here are some tips to help with the process:

  • Talk to the people that do the job - Hopefully, those in your team currently doing the work know how it is done, collectively, at least. They are the best source of information for what you want to set as the documented process.
  • Observe the work - Sometimes what people say they do and what they actually do is different. This is not necessarily a comment on their honesty but often the best operators can’t articulate what they do.
  • Manufacturers’ requirements - When dealing with equipment, it is best to listen to the people that designed and built it.
  • Risk-based approach - Consider conducting a risk assessment such as a Job Safety (or Step) Analysis.

Adding in the Airport People Power

Obviously, simply having a documented process is not going to result in predictable outcomes on its own. Training in the process will be required as will time to hone skills and develop experience. Let’s save this for a future article.

Continuous Improvement

Try as you might, you won’t get everything right the first time. Even if you did, the environment might change or new tools become available. This is where a set of continuous improvement processes are required.

The first practical process to consider is how are corrections or improvements documented for changes to be made. There is probably nothing easier than using a red pen, literally. Have a supply of red pens handy and whenever anybody identifies an issue with a process, ask them to write the details down on a copy of the process using red pen and give it to the person responsible for making changes.

Airport People Power: Discipline

In addition to people learning on the job, it is also good to bring in fresh eyes on a regular basis. Observations of the work in action are invaluable but don’t focus just on adherence to the process. Have observers also consider the objective of the process too. It might be that circumstances have changed and what used to produce the outcome you wanted, isn’t working anymore.

Discipline requires effort - both to build and to maintain. When so much is at stake, safety, security and compliance, we can’t afford to lose it.

In my next article, we will explore the development of airport people beyond the basics, on-the-job training and experience. In the mean time, we are also interested in hearing about our readers experiences, please leave a comment or feedback below.

Images: Header via Flickr, dartboard by Rob Ellis, grade by Dan Parsons.

Public Private Partnership (PPP): How to Get to Transaction Close

Editor's Note: ADB Safegate is underwriting this post and we thank them for their support. If you would like to support the blog, please contact us

In my first article Public Private Partnership (PPP): What You Need to Know, I explained the role of Public Private Partnerships (PPP) and their significance in the development of airports. The activity involves consolidating numerous variables, and disparate interests and motivations into a single working framework i.e. the Airport Master Plan. In this article, I will outline the process that enables these variables to be rationalised and how the PPP mechanism is kick-started.[1]

Public Private Partnership Process

An airport Public Private Partnership exercise is a deal-making activity similar in principle to a merger and acquisition initiative. It is propelled forward by certain built-in logic and compelled by an affinity for the asset. There is a seller-buyer relationship with “offeror” and “offeree” interactions.

The PPP process is usually a one-off, non-standard activity, and is often supported on both sides by external specialists; legal, financial and technical. As in any sale and purchase interaction, there is tension between seller and buyer that is played out. In the PPP instance, conclusion to the deal-making is marked by a milestone which is designated in this article as “Transaction Close”.[2]

At Transaction Close, a Concession Agreement between the parties is signed. The terms and conditions in the transaction will thereon chart the path of the airport’s future development.

Transaction Close is therefore pivotal to an airport’s intended PPP development transformation. This point paves the way for the implementation of design and construction activities (or variations thereof), and the structuring of associated financial and legal frameworks. It is also the point for introducing changes in the management and operational regime at an airport.

The process of reaching Transaction Close is nevertheless intricate and challenging. Elaborating this in a simple way is the main aim of this article.

Four-Phase Process

Getting to Transaction Close may be described as a 4-phase process (see figure).[3]

Public Private Partnership (PPP): How to Get to Transaction Close

Public Private Partnership (PPP): How to Get to Transaction Close

Phase 1 - Recognition and Conception

This initial phase is usually seller-driven. An airport’s owner needs to appreciate the particular attributes of their airport as a productive and performance-based asset. The airport needs to internally acknowledge its commercial potential or enterprise value. A comprehensive understanding of these attributes is fundamental in transforming an airport as bait to lure-in investors.[4]

Firstly, the operational and performance attributes of an airport asset needs to be articulated. It includes calibrating the airport’s socio-economic significance to the local and wider national economy. This is also the point where mandated Strategic Development Goals (SDG’s) are leveraged into the overall Public Private Partnership strategy.

Leveraging an airport’s attributes and articulating its asset value are important. An investor needs information to quickly judge whether an airport can be a viable business proposition, or otherwise. The investor also needs to know if extraneous burdens and risks are within tolerable limits. This represents the public sector offering. Setting this up often requires a shift in the seller’s operational and management mindset.

Then a plan needs to be hatched and resources deployed to present the airport as a prospectus to investors. Internal operational adjustments may also be instituted in parallel to embellish the offering.

As this is typically a detailed non-standard and one-off activity, the services of external specialists are usually brought in. Amongst the output produced is a comprehensive and integrated Airport Master Plan, that coincidentally also includes an Airport Business Plan.

The end result is both parties (seller and buyer) must pick up a compelling belief in the asset’s future potential. Their respective goals in this context must appear tenable. Both establishment and corporate buy-ins are therefore essential; to motivate moving forward and to commit further resources towards advancing the scheme.

For a prospective airport investor, acquiring a positive affinity for the airport asset is important. At this stage, the prospective investor must already sense enterprise value in the airport’s operational future.

ADB Safegate logo

ADB Safegate logo

ADB Safegate is a leading provider of solutions that boost efficiency, improve safety, raise environmental sustainability and reduce operational costs for airports and airlines worldwide. With 900 employees and intelligent solutions spanning airside wide over gate airfield and the tower, the company partners with airports and airlines worldwide to increase airport performance, from approach to departure.

Phase 2 - Viability and Validation

This stage of proceedings is essentially investor-driven.[4]

Mutual interest arising from the parties is formalised through some form of Memorandum of Understanding (MOU). For the public sector offeror, enabling policies, legislative and regulatory frameworks should be suitably deliberated and mandated. Similarly for the private sector investor, Board approvals would be needed as a precondition to proceed.

An MOU defines the rights and obligations, and the mode of conduct in further proceedings. This is especially important with respect to the access and exchange of confidential and/or commercially sensitive information. An MOU invariably also describes an exit plan; i.e. the process in which parties may abort proceedings at various stages of inquiry.

Formal due diligence and the gathering of detailed information begins here. The objective is to obtain robust evidence to ensure enterprise value exists and can be potentially drawn out from the airport’s future [improved] operations.

Amongst data exchanged and examined are all manner of technical, financial and legal information in accordance with the provisions of the MOU. They will study the airport’s facilities and systems, its organisation and human resources structures. There will also be analyses of contractual and commercial arrangements that are currently in place. The quality and presentation of data (i.e. consistency with accepted business best practice) play an important part in catalysing positive affinity towards the asset.

On the seller’s side, due diligence entails reviewing the potential investor’s financial standing, including its managerial and technical capacity to fulfil future expected obligations in the airport context.

The respective findings of the parties are exchanged and deliberated. For the public offeror, these are assessed for compliance against prevailing policy, legislative and regulatory mandates.

For the private investor, the information is checked for compliance against existing Board mandates. Non-compliances arising are further deliberated until revised mandates and/or approvals may be obtained.

As data are gathered and parties become more informed, the nitty-gritty starts and the plot thickens. If conditions at this stage appear tenable, the prospects for partnership will gain traction. Gradually, the fabric of a Public Private Partnership will take shape.

A satisfactory outcome from the above proceedings will lead to the drafting of a Concession Agreement, the next phase.

Phase 3 - Constructing the Mechanism

The foundations of a PPP are formed through the assembly and alignment of technical, contractual and financial variables associated with an asset and its future outlook. Abstract visions and expectations are massaged into solid financial and contractual form that aligns with technical realism.

There are many bundled obligations and various layers of sub-components to bind together. Counter-measures against inherent vulnerabilities need to be formulated.

This gets rather complicated for airports. There will be constraints imposed by each element, and will infringe on the respective interests of the parties. For instance, technical or regulatory requirements may demand capital commitments that are higher than original investor expectations. Borrowing regimes may be obstructive and workers’ unions require excessive pandering. Or contractual provisions may become too onerous, and timelines stretched, and so on.

Provisions are also made to respond to a changing world in the long-term; where established or understood regulations may be vulnerable to political and bureaucratic machinations and change. These risks need to be mitigated and provisions for adjustments and exit strategies need to be put in place.

During this phase, tolerances and compromises to entrenched interests are tested, reworked and assessed. Cohesiveness and the spirit of collaboration between parties must prevail to draw all variables and conflicting interests into balanced convergence.

From the above, a Concession Agreement is constructed. This is the point where serious semblance of a Public Private Partnership would begin to appear.

Phase 4 - Reaching Consensus

The Concession Agreement is a pivotal component that formally binds relevant contractual, technical and financial variables together to make the PPP pursuit work. It is a comprehensive document that instructs on the duties and obligations of the relevant parties within the PPP construction.

During this phase, the negotiating parties will jockey to establish a strong bargaining position.

Both parties will formally define their respective objectives for negotiation and parameters of acceptances.

The final aggregation of these elements is the result of repeated cycles of negotiation and deliberation where internal and external variables, persuasive and dissuasive, are all rationalised, to the best extent possible. They normally have to be passed by the Regulatory Authorities (Public Sector) and Executive Board (Private Sector) for formal approval.

Assuming the trajectory is positive, deal-making is completed when consensus is reached and the Concession Agreement signed. This is when Transaction Close is attained, and when the Public Private Partnership initiative becomes a reality.

The substance of the Concession Agreement will stipulate downstream parameters for the airport throughout the PPP concession period; design and construction requirements, and its future operational and management regime. Along with contractual provisions, financial arrangements are similarly aligned in sync. Its substance (or lack of) is pivotal to the success (or failure) of the entire PPP endeavour.

Further Reflections

This article paints an overly simplistic picture of an undeniably complex process. There is certainly much of the devil lurking in the detail.[5]

The four phases described in reaching Transaction Close do not necessarily play out as distinct sequential activities. Rather they merge from one-phase to another. Often, reversals and backtracking may arise. The path that eventually plays out may be rather contorted and protracted.

At the same time, airport development pursuits are characteristically substantial capital items and are operationally complex. Airports are also variously different from one to another in operational character and technical attributes. Their risk profiles are different. Pitfalls are many. Public Sector leveraging of SDG’s needs to be done with judgemental care as do the pacifying of excessive expectations on returns-on-investment. Standard textbook processes may be limiting in this context and may be an anathema to understood sensibilities.

As proceedings draw closer to Transaction Close, the dialogue tends to be increasingly dominated by financiers and lawyers. As part of a box-ticking process of elimination motivated by time-cost expediency, it is also convenient for technical aspects to be deemed resolved or “fixed” by this stage. This is when technical elements risk being prematurely marginalised. In an airport environment, interdependencies between technical, financial and contractual are inextricable. Any alienation of technical considerations can unwittingly permeate imbalances and performance vulnerabilities in the critical finalisation of the Concession Agreement. This is a compelling point in airport PPP’s.

Garnering cohesiveness and collaboration to advance the process towards multi-party convergence is therefore daunting. Data quality and the nuanced delivery of information matter. Shepherding parties, to commit resources towards a complex activity where the outcome depends upon the solidarity of others, requires a well rounded team, and insightful leadership.

Alas, our reality remains imperfect. And perfection tends to be a troublesome beast easily downtrodden by advocacies of distorted cost-consciousness and reckless quick-fixes. In an airport environment, ill-judged shortcuts taken in the name of expediency is indeed risky. Their results can be severely punishing.[6]

That being said, insightful and thorough scoping remains doable for a balanced and well calibrated Concession Agreement. With diligence and depth of care, a good Transaction Close for airports certainly remains a viable and worthy goal. I hope this article has offered some clarity in advancing your airport Private Public Partnership intentions or have triggered further thoughts on the subject. Will you leave questions or comments in the area below?

ADB Safegate logo

ADB Safegate logo

ADB Safegate is a leading provider of intelligent solutions spanning airside wide over gate airfield and the tower. The company partners with airports and airlines worldwide to help increase airport performance, from approach to departure.

References and Suggested Reading[1] Throughout the article, the term “asset” refers primarily to airports, their related infrastructure and facilities. There may be overlapping generalities that may apply to other classes of assets. Notwithstanding, this article is to be read in the context of airports and their particular characteristics as a special facility that processes aircraft, people and cargo.[2] For simplicity, Transaction Close as used throughout this post shall mean to encompass both “Commercial Close” and “Financial Close”.[3] There are variations and different interpretations of this process. An alternative example by EPEC may be found here[4] In the context of this article, the term “investor(s)” may also refer to lender(s) to the transaction. Although this first phase of activity is usually driven by the Public Sector (seller), unsolicited Public Private Partnership proposals or those catalysed by the Private Sector do exist. They nevertheless invariably require the concurrence of the Public Sector in order to proceed.[5]Generalised (non-airport) details on Public Priave Partnerships may be gleaned from the World Bank PPP Reference Guide[6] How Berlin’s Futuristic Airport Became a $6 Billion Embarrassment

Figure is by author